Container Tilting Installation
-
hosetower gangway hosereels
Engicon N.V (Geldof)
-
Mobile Cementing Unit
COVRA
-
scaffold for the Zeelandbrug
Provincie Zeeland (The Province of Zeeland)
-
Control system Head impactor
SABIC, Bergen op Zoom
-
Hose tower Bitung, Indonesia
Usaha Jayamas Bhakti, Jakarta
-
Replacement filling machine
Molenaar Betonindustrie
-
Climate box Element Material BV
Element Materials B.V.
-
Hose tower Sierra Leone
Bam Leidingen & Industrie
-
Transformer Substation 1250kVA
Vesta Terminal Flushing B.V.
-
ICT/TV Processing Line
Sims Recycling Solutions
-
E&I Installation Tank Terminal
Vesta Terminal Flushing B.V.
-
Chemical metering station
COVRA N.V.
-
Crate tilting device
Sims Recycling Solutions
-
Container Tilting Installation
Sims Recycling Solutions
-
Hose tower Flushing
Vesta Terminal Flushing B.V.
-
Barrel Emptying System
COVRA N.V.
-
Hose Towers for BTT
Naftobudowa SA
-
Stainless Steel Vessels and Tran
NRG and COVRA
-
LCD processing line Sims
Sims Recycling Solutions
Project information
Project description:
Delmeco designed, provided and installed two container tilting installations for Sims Recycling Solutions to help them unload the contents of 20 ft. containers responsibly and safely (taking H&S regulations into account).
A truck places the container on the tilting installation with its hook arm system. The container is secured on the tilting installation by means of the locking system. A door stop is used so that the container doors can be opened safely. This ensures that the contents of the container will never spill over the operator. After the door locks have been uncoupled, the doors are opened automatically by the door stop. The controls ensure that the contents of the container are dumped on the conveyor in a controlled manner.
The assignment comprised:
- Engineering the container tilting installation;
- Constructing the container tilting installation incl. safety features (such as door stopper and guard) and support construction;
- Constructing the control panel incl. testing the automation at Delmeco;
- Installing (E and W) on site at Sims in Eindhoven;
- Running a SAT (Site Acceptance Test) at Sims.
For this project, it was Delmeco’s responsibility (from design to realisation) to complete the container tilting installation and deliver it turn-key and operating.
Client: Sims Recycling Solutions
Sims Recycling Solutions is an international company with branches over the entire world. They specialise in electronics and electro recycling.