Hose tower Bitung, Indonesia
-
hosetower gangway hosereels
Engicon N.V (Geldof)
-
Mobile Cementing Unit
COVRA
-
scaffold for the Zeelandbrug
Provincie Zeeland (The Province of Zeeland)
-
Control system Head impactor
SABIC, Bergen op Zoom
-
Hose tower Bitung, Indonesia
Usaha Jayamas Bhakti, Jakarta
-
Replacement filling machine
Molenaar Betonindustrie
-
Climate box Element Material BV
Element Materials B.V.
-
Hose tower Sierra Leone
Bam Leidingen & Industrie
-
Transformer Substation 1250kVA
Vesta Terminal Flushing B.V.
-
ICT/TV Processing Line
Sims Recycling Solutions
-
E&I Installation Tank Terminal
Vesta Terminal Flushing B.V.
-
Chemical metering station
COVRA N.V.
-
Crate tilting device
Sims Recycling Solutions
-
Container Tilting Installation
Sims Recycling Solutions
-
Hose tower Flushing
Vesta Terminal Flushing B.V.
-
Barrel Emptying System
COVRA N.V.
-
Hose Towers for BTT
Naftobudowa SA
-
Stainless Steel Vessels and Tran
NRG and COVRA
-
LCD processing line Sims
Sims Recycling Solutions
Project information
Project description:
Pertamina is an Indonesian State-owned company that exploits the country's oil-and gas reserves.
Pertamina asked Usaha to upgrade the existing jetty in Bitung, as well as the delivery of a hose tower with the associated equipment.
Usaha commissioned Delmeco to design and build this new hose tower, which will be placed on the jetty.
The hose tower serves to manoeuvre hoses to and from docking ships for the loading and unloading. The cargo generally consists of various types of fuel.
The involved disciplines where engineering, electrical engineering and automation. Consequently, the following work was performed:
- Designing, engineering and drawing the hose tower with subframe, mainframe, and the electrical part.
- Prefab building of the installation at Delmeco. The installation consists in the main of:
- A mainframe and a subframe, inclusive of 2 ladder cages;
- A hydraulic nautical telescopic crane with a 15.5 meter range inclusive of ATEX certified hydraulic winch and hydraulic unit;
- 5 hydraulic sliding beams with a 5 meter range;
- 1 control panel
- Electrical equipment ATEX socket outlets;
- ATEX lighting, emergency lighting, working light;
- 4 hoses 8” and 1 hose 6”, including hose-bun/hose-sling;
- Radio control for the crane and sliding-beams. All the relevant components are designed in EExd (explosion proof) or EExi (intrinsically safe).
- Performing a FAT (Factory Acceptance Test) at Delmeco;
- Preparing the installation for transport in containers to Indonesia.
- Organizing the transport of the containers to Bitung;
- Building the complete installation on location in Bitung;
- Hoisting, placing and complete assembly of the installation on the jetty at Pertamina;
- Performing a SAT (Site Acceptance Test);
- Training and instruction of the operating personnel of Usaha and Pertamina
Within this project Delmeco is responsible for the Turn-Key delivery of the hose towers for all subject disciplines, from design to build.
For more information you can also visit our website: hosetowers.com
Client: Usaha Jayamas Bhakti, Jakarta
PT. Usaha Jayamas Bhakti (UJB) is a contractor & general supplier company and a member of P.E.I. (Petroleum Equipment Institute) specialized in the distribution and contracting of Service Stations. Furthermore, UJB also provides industrial equipment for the oil & gas industry.