E&I Installation Tank Terminal 1

E&I Installation Tank Terminal

See pictures

Project information

Project description:

Delmeco provided the complete electrical and instrumentation installation (E&I) for the renovation of the second terminal (VTF2). The second terminal consists of twelve storage tanks. The tank terminal was renovated in two phases (2 x 6 tanks). The tanks were renovated mechanically and fitted with new instruments, piping and pump installations.

 

In this assignment the fields of electrical engineering and automation overlapped. It comprised:

  • The execution of the detail engineering based on the basic design;
  • Delivery and instalment of the entire E&I installation. The installation mainly consists of:
    • Delivering and installing all cables and cable guiding;
    • Delivering and installing the CCTV installation;
    • Delivering and installing all distribution and control panels;
    • Connecting all instrumentation (a.o. pumps, MOVs, and the entire tank guarding and security);
    • Fitting all terminal lighting;
    • Fitting earthing and a potential equalisation installation;
    • Expanding the existing fire safety installation;
  • Starting up the E&I installation;
  • Running a FAT (Factory Acceptance Test) for the distribution and control panels;
  • Running a SAT (Site Acceptance Test) on location at Vesta.

For this project, it was Delmeco’s responsibility to complete and deliver turn-key and operating, the I&E of the second Vesta terminal (VTF2).

Client: Vesta Terminal Flushing B.V.

Vesta Terminal Flushing B.V. (VTF) is a tank terminal with three locations in Vlissingen. Vesta’s main activity is the storage and transferral of a wide range of petroleum products and bio fuels. Vesta is a subdivision of the worldwide Mercuria Energy Group.