E&I Installation Tank Terminal
-
hosetower gangway hosereels
Engicon N.V (Geldof)
-
Mobile Cementing Unit
COVRA
-
scaffold for the Zeelandbrug
Provincie Zeeland (The Province of Zeeland)
-
Control system Head impactor
SABIC, Bergen op Zoom
-
Hose tower Bitung, Indonesia
Usaha Jayamas Bhakti, Jakarta
-
Replacement filling machine
Molenaar Betonindustrie
-
Climate box Element Material BV
Element Materials B.V.
-
Hose tower Sierra Leone
Bam Leidingen & Industrie
-
Transformer Substation 1250kVA
Vesta Terminal Flushing B.V.
-
ICT/TV Processing Line
Sims Recycling Solutions
-
E&I Installation Tank Terminal
Vesta Terminal Flushing B.V.
-
Chemical metering station
COVRA N.V.
-
Crate tilting device
Sims Recycling Solutions
-
Container Tilting Installation
Sims Recycling Solutions
-
Hose tower Flushing
Vesta Terminal Flushing B.V.
-
Barrel Emptying System
COVRA N.V.
-
Hose Towers for BTT
Naftobudowa SA
-
Stainless Steel Vessels and Tran
NRG and COVRA
-
LCD processing line Sims
Sims Recycling Solutions
Project information
Project description:
Delmeco provided the complete electrical and instrumentation installation (E&I) for the renovation of the second terminal (VTF2). The second terminal consists of twelve storage tanks. The tank terminal was renovated in two phases (2 x 6 tanks). The tanks were renovated mechanically and fitted with new instruments, piping and pump installations.
In this assignment the fields of electrical engineering and automation overlapped. It comprised:
- The execution of the detail engineering based on the basic design;
- Delivery and instalment of the entire E&I installation. The installation mainly consists of:
- Delivering and installing all cables and cable guiding;
- Delivering and installing the CCTV installation;
- Delivering and installing all distribution and control panels;
- Connecting all instrumentation (a.o. pumps, MOVs, and the entire tank guarding and security);
- Fitting all terminal lighting;
- Fitting earthing and a potential equalisation installation;
- Expanding the existing fire safety installation;
- Starting up the E&I installation;
- Running a FAT (Factory Acceptance Test) for the distribution and control panels;
- Running a SAT (Site Acceptance Test) on location at Vesta.
For this project, it was Delmeco’s responsibility to complete and deliver turn-key and operating, the I&E of the second Vesta terminal (VTF2).
Client: Vesta Terminal Flushing B.V.
Vesta Terminal Flushing B.V. (VTF) is a tank terminal with three locations in Vlissingen. Vesta’s main activity is the storage and transferral of a wide range of petroleum products and bio fuels. Vesta is a subdivision of the worldwide Mercuria Energy Group.