The iconic Zeelandbrug is the longest bridge in the Netherlands, crossing the Oosterschelde with a total length of over 5 km. The bridge is owned and maintained by Provincie Zeeland.
The extended work platform is primarily intended for inspection and maintenance activities on the western side of the Zeelandbrug. The existing aerial work platform is used for inspection and maintenance activities on the western and underside of the bridge, while the East Aerial Work Platform is mainly intended for various inspection and maintenance activities on the eastern side. Access to these installations is only possible via the cycle path on the western side of the bridge.
With these customised solutions, we make an important contribution to the safe and efficient maintenance of this iconic Zeelandbrug.
The scope of work for the mechanical, electrical and automation disciplines included:
-
Designing, engineering, drafting and calculating the aerial work platforms by Delmeco Consulting and Engineering Agency
-
Manufacturing and delivering the aerial work platforms
-
Performing a Factory Acceptance Test (FAT) at Delmeco
-
Hoisting and installing the installations on the Zeelandbrug
-
Testing and commissioning the installations in our own workshop and on the Zeelandbrug
-
Performing a Site Acceptance Test (SAT)
Client:
Provincie Zeeland is a governmental organisation that represents the interests of the province and develops policy in the areas of economy, nature, infrastructure, culture and living environment. The province works together with municipalities, the national government, businesses and social organisations to ensure that Zeeland remains liveable, accessible and economically strong.