Scope of work:
-
Design and engineering of the transformer substation
-
Supply and installation of a transformer substation with a 1250 kVA transformer
-
Installation of a medium-voltage switchboard
-
Supply and connection of a low-voltage distribution panel
-
Installation of a no-break system (UPS) for the E&I installation
-
Construction of the earthing system
-
Connection and commissioning of the entire transformer substation
Delmeco was responsible for the full turn-key delivery of the transformer substation.
Client:
Vesta Terminal Flushing B.V. is a tank terminal with three locations in Vlissingen, the Netherlands. The company specializes in the storage and transshipment of a wide range of petroleum products and biofuels.